New Projects

1.Railway Siding:

A state of the art Railway siding for smooth evacuation of Petcoke and Polypropylene

Dispatches by Railway Wagons will improve safety in transportation, reduced environmental pollution, Make MRPL products conveniently available in competitive markets and improve commercial realisation to MRPL.

The Railway siding will be executed by M/s Konkan Railway Corporation Ltd and M/s Mecon are appointed as the EPCM consultant to execute the balance of the Project consisting of petcoke closed conveyor system, loading silos, measuring devices, pollution control facilities etc.

The Project is scheduled for completion by June-2017.

2. Capacity Revamp of CCR2:

The existing CCR-2 unit is being revamped to produce higher quantity of Reformate, yielding higher quantity of MS.

MRPL currently has two numbers of NHT/ CCR (Platformer Unit).Both the units are of identical capacity and licensed by M/s UOP. The objective of the unit is to upgrade the low octane heavy naphtha to High octane reformate. In MRPL the feedstock to the Platformer unit is heavy naphtha from crude distillation units and Hydrocracker units.

M/s UOP are the Licensor and M/s L&T, Chiyoda are appointed as EPCM consultant for the project.

The Project is scheduled for completion by end of Sep-2018.

3. MS, HSD, ATF Day Tanks, Loading Bays and Truck Parking Terminal:

This project would provide higher flexibility to our company and allow for higher marketing outreach.

The Project includes construction of MS, HSD and ATF tanks and Truck Loading facility along with the Truck parking terminal at Lower Plateau MRPL land adjacent to the refinery complex.

M/s Mecon are appointed as EPCM consultant for the project. The Project is scheduled for completion by July-2017.

4. Flare Gas recovery System (FGRS):

This project recovers gases that are lost to the flare and to utilise it as fuel, thereby saving cost. This also helps to reduce the Carbon footprint of our company by reducing greenhouse gas emissions.

FGRS package will be located near to the existing main flare KOD of phase-3 flare area. Based on flaring patterns, it is proposed to install 2 no’s of compressors with all other associated equipments and piping.

M/s Mecon are appointed as EPCM consultant for the project. The Project is scheduled for completion by October-2017.

5. Pet Coke silos for Trucks & Wagon Loading, Covered shed for sulphur yard:

This facility allows our company to attain higher flexibility in marketing of Pet-Coke and to mitigate environmental impact of concentrated loading.

The Project includes installation of additional petcoke silos with associated conveying system.

M/s Mecon are appointed as EPCM consultant for the project. The Project is scheduled for completion by June-2017.

Additional Tankages:

This Facility will improve the Operation efficiency, enhancing the product portfolio.

The Project includes construction of following tanks

Naphtha storage tanks at Aromatic Terminal (OMPL)-2 no’s

VG-40 storage tanks-2 no’s

Inlet receiving tanks at WWTP3-2 no’s

M/s Mecon are appointed as EPCM consultant for the project. The Project is scheduled for completion by Nov-2017.

7. Integrated Security Management System:

With an objective of upgrading the security infrastructure, MRPL has decided to implement an effective Integrated Security Management System (ISMS). The proposed solution should allow MRPL to locally and centrally monitor its facilities from a remote location securely on a Portable/Fixed personal computer monitor using IP-based Cameras in a bandwidth efficient manner.

system comprises of Video Management System, Access Control System (for Control Rooms), Perimeter Intrusion Detection/Prevention System & the setting up of Command & Control Rooms.

M/s Maha Infotech are appointed as EPCM consultant for the project. The Project is scheduled for completion by Sep-2017

8. Civil Projects:

Following Projects are at various stages of construction/ Floating of Tender/Tender Preparation.

  • Construction of 124 no of Flats at MRPLTownship
  • Construction of 124 no of Flats at MRPLTownship
  • Security Compound Wall near Fire water Tanks and Phase3 Flare Area.
  • Design and construction of New PFCC Catalyst Shed
  • Hazardous Waste Storage Shed
  • PPU ware house loading shed
  • Construction of Additional office space at 2nd floor of Administrative Building
  • Construction of operators Cabins at DCU, PFCC & CPP-3 and Rest Shelter with Toilet facilities at PPU Ware House
  • Construction of DM plant Neutralization Pit
  • Construction of DM plant Neutralization Pit
  • PP petcoke evacuation road